In Brief
Chugach Electric Association (CEA), an electric utility company in Anchorage, Alaska, needed an experienced network engineer to update critical networking equipment. Resource Data provided a Cisco-certified Systems Engineer to supplement CEA’s staff for a year. The engineer assisted with planning, testing, and replacing the core switch, installing a new Cisco Internet router, and other tasks. The collaboration ensured high-value projects were completed without unexpected downtime, preparing CEA for another decade of reliable networking.

Challenge
CEA operates a complex, geographically dispersed, high-value network supported by a small team. When several critical pieces of networking equipment needed replacement, CEA saw an opportunity to augment their staff with a skilled network engineer.
Solution
Resource Data provided CEA with a Cisco-certified Systems Engineer for one year. The engineer:
- Planned, tested, and replaced the Cisco (Catalyst OS) core switch with a modern unit, advancing their networking technology by 10 years
- Assisted in acquiring a BGP AS number (used for routing Internet traffic), installing a new Cisco Internet router, and controlling Internet routing advertisements.
- Supported CEA staff during their in-house expert’s absence and researched specific problems to enhance internal knowledge.
Approach
Resource Data’s Systems Engineer worked closely with CEA Network Administrators, providing regular updates and insights into their network. As the core switch project testing concluded, the engineer transitioned to a project management role, generating schedules, task lists, and consulting on issues. This proactive collaboration facilitated seamless execution of high-value projects, ensuring CEA’s network was robust and future-proofed.

Our Work
Inspiring stories to read next.
Case Study FAQ
An electric utility can do this by combining careful planning, pre-cutover testing, and supplemental engineering support, so the existing team is not forced to carry a high-risk infrastructure to refresh alone. In utility environments, network upgrades are not routine back-office changes. They affect critical operations, communications, and overall service reliability, which means even a well-intentioned refresh can create outsized risk if the work is rushed or under-resourced.
That is why the safest approach includes staged testing, clear execution planning, and strong coordination with internal network administrators before equipment is replaced. The goal is not just to swap hardware. It is to modernize the environment in a way that preserves continuity for the utility and the members it serves.
In Resource Data’s case study, Chugach Electric Association needed to replace critical networking equipment across a complex, dispersed network while avoiding disruption. Resource Data provided a Cisco-certified Systems Engineer who helped plan, test, and replace the core switch and support other network modernization tasks. This Resource Data case study demonstrates that utilities can complete high-value network upgrades safely when preparation and execution are handled with discipline. The operational impact is reducing downtime risk, smoother project delivery, and a more reliable network foundation for future operations.
A utility should look for a way to augment its internal team with experienced infrastructure support that can integrate quickly into ongoing work without creating additional coordination overhead. When several critical upgrades land at the same time, the problem is often not lacking internal knowledge. It is a lack of available bandwidth to plan, test, execute, and document everything at the level of care the work requires.
This is especially important in utilities, where small network teams often support large, business-critical environments. If the team is already busy maintaining day-to-day operations, major upgrade work can create schedule pressure, knowledge bottlenecks, and avoidable unnecessary risk. The right outside support helps the organization move forward without overwhelming internal staff.
In Resource Data’s case study, Chugach Electric Association saw an opportunity to supplement its small team with a skilled network engineer when several critical pieces of equipment needed replacement. Resource Data’s engineer worked closely with CEA’s administrators, helped carry the load, and supported progress through planning, testing, and execution. This Resource Data case study demonstrates that staff augmentation can be a strategic move during infrastructure transitions. The business and operational impacts are stronger project capacity, less strain on internal staff, and greater confidence that upgrades will be completed well.
It matters because core switching and internet routing sit at the heart of how network traffic moves across the organization. When those components become outdated, the risk is not only that the hardware gets old. The utility may also lose flexibility, fall behind current networking capabilities, and face a narrower margin for error if something fails or if new operational demands arise.
For a utility, that kind of infrastructure is part of the backbone that supports reliable internal communications and system connectivity. Modernizing it is often as much about long-term resilience as performance. A newer, better-supported environment can position the organization to operate more confidently for years instead of continuing to patch around aging equipment.
In Resource Data’s case study, the core switch replacement advanced Chugach Electric Association’s networking technology by roughly 10 years, and Resource Data’s engineer also helped with a new Cisco internet router and BGP routing work. The case study makes clear that the effort prepared CEA for another decade of reliable networking. This Resource Data case study demonstrates that infrastructure replacement at the network core is a long-term resilience decision, not just a hardware refresh. The operational impact is better reliability, stronger future readiness, and a more durable utility network.
Outside engineering support improves the project when it works as a force multiplier for the internal team rather than operating as a disconnected contractor. In strong utility engagements, outside experts do not just complete isolated tasks. They collaborate closely with in-house administrators, share updates regularly, and help the organization make better technical and operational decisions while keeping the internal team in the loop.
That model matters because utilities need to preserve internal understanding of their environment. A project may move faster in the short term if a consultant works independently, but the organization gains more lasting value when external expertise strengthens internal knowledge and supports continuity during periods of limited staffing or expert absence.
In Resource Data’s case study, the Systems Engineer worked closely with Chugach Electric’s Network Administrators, supported the team during the absence of an in-house expert, and researched specific problems to enhance internal knowledge. As technical testing wrapped up, the engineer also shifted into more of a project management role to help keep execution organized. This Resource Data case study demonstrates that outside support is most valuable when it reinforces internal capability while helping critical work get done. The operational impact is better collaboration, improved continuity, and less dependence on any one individual during major upgrades.
A successful network modernization project leaves behind a stronger operating environment, better project coordination, and more confidence that the utility can support future needs without carrying the same level of infrastructure risk. New hardware matters, but the bigger outcome is that the organization is in a better position to maintain reliable service, manage future upgrades, and respond to technical challenges with less disruption.
That is especially true when the project includes planning support, testing discipline, and closer coordination between engineers and administrators. Those elements help the utility do more than finish the immediate replacement. They help strengthen how network projects are managed going forward.
In Resource Data’s case study, the engagement helped Chugach Electric Association complete high-value projects without unexpected downtime, modernize key routing and switching components, and improve execution through schedules, task lists, and consulting support. Resource Data’s example shows that successful network modernization leaves behind both technical improvements and operational readiness. The business and operational impact is a more future-proof network, smoother infrastructure project delivery, and better long-term reliability for the utility.